Ph: (949) 273-6444 Fax: (949) 273-6445
A Professional General Engineering Contracting Company
Berths 20-24 Gate Improvements
Oakland, California
DCI/CIC has recently completed a $10,000,000 project located at the Port of Oakland. This pro-ject consisted of the construction of new entry and exit gates and relocation and construction of existing utilities. These gate facilities incorporate state-of-the-art safety and security measures associated with terminal access. Construction also included: staff parking, modular operations building, communications, and power infrastructure between the gates and operations building. Due to the requirements of the terminal operator, this project was on a fast track and the dura-tion was 4 months from start to finish.
The entry gate facility includes two security stations, utilities, Transportation Worker Identifica-tion Credential Card and Radio Frequency Identification readers, nine entry lanes including six platform scales with camera bridges, intercom pedestals, canopies, and entry queuing lanes as well as a new traffic signal controlled entry gate.
Location
Port of Oakland
Size
The project included pulverizing and cement treating 500,000 square feet of existing asphalt concrete and utilizing the recycled AC base for 500,000 square feet of new asphalt cement paving